fuel dispenser

now browsing by tag

 
 

SKS E. Street Tank Removal

Jauregui & Culver, Inc. removed three 10,000 gallon double wall tanks from the site. We provided UST removal permits from the San Diego County DEH and city Fire department. Temporary facilities and storm water control measures were provided as needed, including fencing, sanitary facilities, and storm water inlet protection. The fuel system was removed, including the tanks, product piping, vapor return piping, and vent piping. We removed and disposed the hardscape over the tanks and piping. All concrete fuel islands, and all equipment on them including the dispensers, lights, pedestals, bollards and UDC’s, generator shed, and electronics cabinet were also removed. We washed, iced, hauled, and lawfully disposed of the USTs, including waste manifests of UST wash materials and tank destruction receipts. After removal of the tanks and piping, we back-filled and compacted the tank excavation and trenches with materials taken from them during the removal process. New backfill material equal in volume to the removed UST’s were included.

Sam’s Club Vacaville #6433

Jauregui & Culver, Inc. repaired one under dispenser containment (UDC) unit. The UDC was leaking brine liquid. Jauregui & Culver, Inc. excavated next to the UDC and sealed the leak using fiberglass matting and resin per manufacture specifications and industry standards. Once completed, the Veeder Root sensor was reinstalled and tested for functional ability.

 

 

 

 

Dion & Sons AST Removal & Replacement

Jauregui & Culver, Inc. removed the three existing diesel above ground storage tanks (ASTs) located at the existing Woodside facility and replaced them with two 12,000 gallon cylindrical ASTs.

Jauregui & Culver, Inc. provided necessary drawings and submittals to the City in order to procure permits. The removal of existing tanks included the removal of the sheet metal roof, sheet metal wall and support framework, and chain-link gates. The existing ASTs were washed and lawfully disposed of. The existing AST masonry support structures, tank slab, curbing, and concrete drive slab were removed so that the new ASTs could be placed side by side with adequate setback distances between the building and the ASTs. The existing diesel below ground piping extending from the pump to the AST enclosure was cut and temporarily capped while Jauregui & Culver, Inc. installed a new SWFG piping transition sump and extended the piping. Jauregui & Culver, Inc. poured a new slab. We furnished and installed 6″ diameter concrete filled steel bollards. The ASTs were assembled and installed.

Jauregui & Culver, Inc. will continue to do the testing and maintenance of this facility, ensuring that it is safe, up to code, and working properly for Dion & Sons.

 

Pala Mini Mart Dispenser Replacement

Jauregui & Culver, Inc. furnished and installed new dispensers for the Pala Casino Mini Mart. We also fabricated and installed a column style canopy extension which including engineer drawings and structural calculations.