Scripps Memorial Hospital

Jauregui & Culver, Inc. furnished and installed three UST’s for the emergency generator and boiler, potable water tank, and septic tank. We put in flex, double wall, steel piping and provided trenching and back-fill.

 

 

 

 

 

COC Fuel Facility

Jauregui & Culver, Inc. did a full design build for the County of San Diego Operation’s fuel facility. We procured permits, installed tanks, canopy, and a fuel system. We custom built the shoring that went in on the sides of the tank hole. The concrete footings, tank slab, and drive slabs were poured. Jauregui & Culver, Inc. also installed the fuel management system and continues to provide service and testing for the station. The existing fuel site was demolished, and can be seen here.

In addition, Jauregui & Culver, Inc. provided piping for the emergency generator system and is continuing to design build for the emergency generator system and other projects at this facility.

 

 

 

 

Sam’s Club Bakersfield #4819

Sam’s Club #4819 Bakersfield was a ground up fuel station. Jauregui & Culver, inc. excavated and installed two 20,000 gallon 87 gasoline and one 20,000 gallon split 12,000/8,000 10′ diameter Xerxes Underground Storage Tanks (UST) and deadmen.

We installed Fiberglass, APT, and steel piping to compile the fueling system, including trenching and gravel backfill. Two 3+1 gas/diesel dispensers and four 3+0 gas dispensers were installed, including the Under Dispenser Containment (UDC) basins, dispenser hanging hardware, and dispenser valance. Brine and vacuum tubing for the Veeder Root continuous monitoring and Pressure and Flow sensors in dispenser for the In Station Diagnostics (ISD). The Healy Clean Air Separator (CAS) was installed as part of the EVR II system.

We provided required Enhanced Leak Detection (ELD) testing of the fuel system at the conclusion of the installation of the fueling system and prior to opening. All fuel lines were purged and the dispensers calibrated, completing this project.

Scripps Memorial Hospital Tank Installation

Watch as our team flawlessly installs this UST at Scripps Memorial Hospital.

 

Fallbrook Village Aviation UST Removal

Two unknown tanks were discovered during development of this property. Jauregui & Culver removed two single-wall steel underground storage tanks approximated at 4,000 gallons each.

We furnished the San Diego Country Department of Environmental Health (DEH) and Fallbrook Fire Department UST Removal permits, including permit fees, permit application preparation, submission, and pick up.  A one time California State EPA number was obtained as required for manifesting and disposal purposes. We washed the UST’s and degas as required by agency guidelines.

The UST’s and all wash stream was manifested and lawfully disposed of. Soil samples were taken and analyzed. Jauregui & Culver, Inc. will back-fill with material equal to the volume of the removed UST’s and back-fill the tank hole to subgrade.

 

 

 

University of San Diego Tank Removal

 

 

 

 

 
Jauregui & Culver, Inc. removed a 10,000 gallon underground storage tank from beneath one of the campus roadways.  We furnished permits, testing, and environmental remediation.  Additionally, the soil around the tank was found to be contaminated.  Jauregui & Culver removed and disposed of the contaminated soil overburden in accordance to the county’s regulations.

 

 

CarMax Oxnard

Jauregui & Culver, Inc. provided submittals and drawings of the proposed fuel system necessary for CUPA, Fire Department, and Air Quality agency permitting.  We furnished and installed a complete gasoline fuel system that included one 4,000 double wall fiber glass underground storage tank, fuel dispenser, below ground fueling, vapor return and tank vent piping, under dispenser containment, vent transition containment, an enhanced vapor recovery system, and a vapor root monitoring system.  This required excavation, disposal of excavated soil, gravel back-fill materials meeting manufacturer specifications, crane, and back-filling operations. The new dispenser was calibrated and brought to compliance and Enhance Leak Detection was provided.

 

 

Carmax Escondido

Jauregui & Culver, Inc. installed a complete fuel system which included permits for San Diego County Environmental Health (DEH), San Diego County Air Pollution Control District (APCD) and City of Escondido fire department. a 4,000 gallon double wall fiber glass tank, fuel dispenser, and piping for the below-ground fuel, vapor return, and tank vent. Recovery (EVR) system and a Veeder Root monitoring system were also installed.  Calibration for the new dispenser, and regulatory compliance Enhance Leak Detection (ELD) testing were also provided.

 

 

 

7-11 Cardiff-By-The-Sea

Jauregui & Culver, Inc. removed the existing fuel tanks at 7-11 Cardiff-by-the-Sea fuel station and replaced them. We provided permits, shoring, new dispensers, and a complete re-piping of the fuel lines.  Environmental remediation was also provided.

 

 

 

 

Current Projects

 Current Projects

These are just a few of the many projects Jauregui & Culver, Inc. is part of.  In addition, we service over 300 different sites throughout California.  We offer our customers the very best in safety, quality, and customer service.

 

Sam’s Club Fullerton, CA ground up station

Gaslamp Hotel San Diego, CA emergency generator install

AST Upgrades  Multiple sites.  More details can be found here.