California Highway Patrol Chico, CA
Jauregui & Culver, Inc. installed a complete fueling system including an Above-Ground Storage Tank, two Wayne dispensers, two FuelMaster pedestals, veeder-root, and more. Also installed was a complete fueling system for a back-up Generator including Above-Ground Storage Tank, Simplex Packaged Pump Set unit, and piping.
Dion & Sons AST Removal & Replacement
Jauregui & Culver, Inc. removed the three existing diesel above ground storage tanks (ASTs) located at the existing Woodside facility and replaced them with two 12,000 gallon cylindrical ASTs.
Jauregui & Culver, Inc. provided necessary drawings and submittals to the City in order to procure permits. The removal of existing tanks included the removal of the sheet metal roof, sheet metal wall and support framework, and chain-link gates. The existing ASTs were washed and lawfully disposed of. The existing AST masonry support structures, tank slab, curbing, and concrete drive slab were removed so that the new ASTs could be placed side by side with adequate setback distances between the building and the ASTs. The existing diesel below ground piping extending from the pump to the AST enclosure was cut and temporarily capped while Jauregui & Culver, Inc. installed a new SWFG piping transition sump and extended the piping. Jauregui & Culver, Inc. poured a new slab. We furnished and installed 6″ diameter concrete filled steel bollards. The ASTs were assembled and installed.
Jauregui & Culver, Inc. will continue to do the testing and maintenance of this facility, ensuring that it is safe, up to code, and working properly for Dion & Sons.
San Diego Zoo Safari Park
Jauregui & Culver, Inc. installed an above ground diesel storage tank (AST) for the Wild Animal Park (which is now the San Diego Zoo Safari park.) Jauregui & Culver, Inc. procured permits, poured the slab and put in the tank. We continue to service and provide regulatory compliance testing for the tank.
LPL San Diego Tower
Jauregui & Culver, Inc. procured permits for and installed a 4,000 gallon Above-ground Storage Tank (AST) for diesel and double wall steel fuel piping. We furnished and installed AST remote fill assembly, fuel filtration unit, fuel management control panel, Duplex pump system, and tank monitoring system, including all low voltage electrical wiring and conduit.
CarMax Oxnard
Jauregui & Culver, Inc. provided submittals and drawings of the proposed fuel system necessary for CUPA, Fire Department, and Air Quality agency permitting. We furnished and installed a complete gasoline fuel system that included one 4,000 double wall fiber glass underground storage tank, fuel dispenser, below ground fueling, vapor return and tank vent piping, under dispenser containment, vent transition containment, an enhanced vapor recovery system, and a vapor root monitoring system. This required excavation, disposal of excavated soil, gravel back-fill materials meeting manufacturer specifications, crane, and back-filling operations. The new dispenser was calibrated and brought to compliance and Enhance Leak Detection was provided.