Demolition
now browsing by category
SKS E. Street Tank Removal
Jauregui & Culver, Inc. removed three 10,000 gallon double wall tanks from the site. We provided UST removal permits from the San Diego County DEH and city Fire department. Temporary facilities and storm water control measures were provided as needed, including fencing, sanitary facilities, and storm water inlet protection. The fuel system was removed, including the tanks, product piping, vapor return piping, and vent piping. We removed and disposed the hardscape over the tanks and piping. All concrete fuel islands, and all equipment on them including the dispensers, lights, pedestals, bollards and UDC’s, generator shed, and electronics cabinet were also removed. We washed, iced, hauled, and lawfully disposed of the USTs, including waste manifests of UST wash materials and tank destruction receipts. After removal of the tanks and piping, we back-filled and compacted the tank excavation and trenches with materials taken from them during the removal process. New backfill material equal in volume to the removed UST’s were included.
COC Fuel Facility
Jauregui & Culver, Inc. did a full design build for the County of San Diego Operation’s fuel facility. We procured permits, installed tanks, canopy, and a fuel system. We custom built the shoring that went in on the sides of the tank hole. The concrete footings, tank slab, and drive slabs were poured. Jauregui & Culver, Inc. also installed the fuel management system and continues to provide service and testing for the station. The existing fuel site was demolished, and can be seen here.
In addition, Jauregui & Culver, Inc. provided piping for the emergency generator system and is continuing to design build for the emergency generator system and other projects at this facility.
University of San Diego Tank Removal
Jauregui & Culver, Inc. removed a 10,000 gallon underground storage tank from beneath one of the campus roadways. We furnished permits, testing, and environmental remediation. Additionally, the soil around the tank was found to be contaminated. Jauregui & Culver removed and disposed of the contaminated soil overburden in accordance to the county’s regulations.
Current Projects
Current Projects
These are just a few of the many projects Jauregui & Culver, Inc. is part of. In addition, we service over 300 different sites throughout California. We offer our customers the very best in safety, quality, and customer service.
Sam’s Club Fullerton, CA ground up station
Gaslamp Hotel San Diego, CA emergency generator install
AST Upgrades Multiple sites. More details can be found here.
Sam’s Club Sacramento #4760
The closure of Sam’s Club Sacramento #4760 necessitated the removal of two 20,000 gallon unleaded regular underground storage tank (UST) and one 20,000 gallon split 12,000/8,000 gallon Unleaded Super underground storage tank. Jauregui & Culver, Inc. was contracted to do the following work. Concrete slabs, vapor return, and vent piping were removed and lawfully disposed.
Under the direction of the county CUPA and local Fire agency we removed the UST and piping from the trenches and lawfully disposed. The tanks were washed and degassed with all wash materials manifested and disposed of lawfully.
The excavation and piping trenches were backfilled and compacted with clean fill materials and gravel to 90% compaction.
Sam’s Club La Quinta #4941
The closure of Sam’s Club La Quinta 4941 necessitated the removal of two 20,000 gallon unleaded regular underground storage tank (UST) and one 20,000 gallon split 12,000/8,000 gallon Unleaded Super underground storage tank. Jauregui & Culver, Inc. was contracted to do the following work: concrete slabs, vapor return, and vent piping were removed and lawfully disposed.
Under the direction of the county CUPA and local Fire agency we removed the UST and piping from the trenches and lawfully disposed. The tanks were washed and degassed with all wash materials manifested and disposed of lawfully.
The excavation and piping trenches were backfilled and compacted with clean fill materials and gravel to 90% compaction.
Federal, State, City & Municipal
Federal & State Government/City/Municipality Customers
US Navy – Port Hueneme, Oxnard, CA.
Underground Storage Tank (UST) installation, shoring w/high water issues, UST piping and environmental remediation.
US Navy – North Island, San Diego, CA.
Underground Storage Tank removal and Aboveground Tank (AST) installation.
US Navy – San Clemente Island, CA.
Underground Storage Tank removal and Aboveground Tank installation.
US Boarder Patrol – San Diego, CA.
UST re-piping, UST tank top, Under Dispenser Pans and Veeder Root System.
US Boarder Patrol – Tecate, CA.
Re-piping and Boiler repairs.
FAA Western Samoa Islands
Underground Storage Tank upgrades
County of San Diego, CA.
- San Diego Operations- UST installation, piping, demolition, and generator install
City of San Diego, CA.
- Mt. Hope Cemetery Maintenance Facility – UST removal and AST installation
- ESD Operations – Secondary Containment repairs
- Barrett Lake – UST removal and AST installation
- El Capitan Reservoir – UST removal and AST installation
City of Rancho Cucamonga, CA.
UST removal and AST with Dispnser installation
El Cajon USD, CA.
UST removal and AST installation
El Toro Water District, CA.
UST removal and AST installation
City of Murrietta Police Department
AST installation
Indian Reservations
Pala Mini Mart
Re-pipe and dispenser replacement
We continue to strive to be the best and to work for the best!
County of San Diego Canopy Demolition
It is our pleasure to show you firsthand what we can do. This is the demolition of a canopy at the County of San Diego Operations. Watch how smoothly our team works as they make the final cuts of the canopy, and bring it down!