Hoehn Mercedes Upgrade

Jauregui & Culver, Inc. furnished and installed new double wall fiberglass underground piping, fiberglass sumps for the existing tank collar, dispensers and pump containment boxes, and all penetration fittings. All existing product dispenser containment box and tank sumps were removed per DEH requirements and soil samples were analyzed. The existing underground tank, tank collars, and vent lines remained in place.
Jauregui & Culver, Inc. will continue to provide monitoring certification, precision line testing, and SB989 testing to insure the safety and functionality of the site.
Dion & Sons AST Removal & Replacement

Jauregui & Culver, Inc. removed the three existing diesel above ground storage tanks (ASTs) located at the existing Woodside facility and replaced them with two 12,000 gallon cylindrical ASTs.
Jauregui & Culver, Inc. provided necessary drawings and submittals to the City in order to procure permits. The removal of existing tanks included the removal of the sheet metal roof, sheet metal wall and support framework, and chain-link gates. The existing ASTs were washed and lawfully disposed of. The existing AST masonry support structures, tank slab, curbing, and concrete drive slab were removed so that the new ASTs could be placed side by side with adequate setback distances between the building and the ASTs. The existing diesel below ground piping extending from the pump to the AST enclosure was cut and temporarily capped while Jauregui & Culver, Inc. installed a new SWFG piping transition sump and extended the piping. Jauregui & Culver, Inc. poured a new slab. We furnished and installed 6″ diameter concrete filled steel bollards. The ASTs were assembled and installed.
Jauregui & Culver, Inc. will continue to do the testing and maintenance of this facility, ensuring that it is safe, up to code, and working properly for Dion & Sons.