Sam’s Club Murrieta #4822

Jauregui & Culver, Inc. provided a turnkey fuel system replacement including tanks, dispensers, piping, monitoring system, Healy Clean Air Separator, and vent assembly. Additionally, we furnished and installed a 10,000 gallon diesel UST to add to the existing fuel system.

 

 

BlueSky Emergency Generator Fill System Installation

 

Jauregui & Culver, Inc. furnished and installed the Pryco Remote Fill Station and piped from the remote fill port to the generator’s belly tank with Brugg double wall stainless steel flexible pipe. The piping was run continuous with no joints. We installed a conduit and wiring from the fill station to the generator belly tank to the tank high/low sensor and wired for the solenoid valve. Jauregui & Culver, Inc. provided all testing and inspections.

 

 

 

Pala Mini Mart Re-Pipe

Jauregui & Culver, Inc. replaced the fuel piping for the Pala Mini-Mart.  We phased the work so that at least one row of dispensers was operational during construction.  We purged the fuel in the existing below ground piping back into the underground storage tanks (USTs) with pressurized nitrogen.  The existing piping was abandoned in place after the fuel was removed.

We sawcut and removed the existing concrete and asphalt surfaces between the USTs and the dispensers as needed for the installation of the double wall fiber glass piping.  We dug pipe trenches and gravel bedding materials required by the pipe manufacturer and to meet industry standards.

We performed pressure tests to all the new piping per industry standards.  We purged the fuel into the new piping system and tested for proper operation, calibrated the dispensers, and replaced all dispenser fuel filters.

 

 

Fallbrook Village Aviation UST Removal

Two unknown tanks were discovered during development of this property. Jauregui & Culver removed two single-wall steel underground storage tanks approximated at 4,000 gallons each.

We furnished the San Diego Country Department of Environmental Health (DEH) and Fallbrook Fire Department UST Removal permits, including permit fees, permit application preparation, submission, and pick up.  A one time California State EPA number was obtained as required for manifesting and disposal purposes. We washed the UST’s and degas as required by agency guidelines.

The UST’s and all wash stream was manifested and lawfully disposed of. Soil samples were taken and analyzed. Jauregui & Culver, Inc. will back-fill with material equal to the volume of the removed UST’s and back-fill the tank hole to subgrade.

 

 

 

University of San Diego Tank Removal

 

 

 

 

 
Jauregui & Culver, Inc. removed a 10,000 gallon underground storage tank from beneath one of the campus roadways.  We furnished permits, testing, and environmental remediation.  Additionally, the soil around the tank was found to be contaminated.  Jauregui & Culver removed and disposed of the contaminated soil overburden in accordance to the county’s regulations.

 

 

CarMax Oxnard

Jauregui & Culver, Inc. provided submittals and drawings of the proposed fuel system necessary for CUPA, Fire Department, and Air Quality agency permitting.  We furnished and installed a complete gasoline fuel system that included one 4,000 double wall fiber glass underground storage tank, fuel dispenser, below ground fueling, vapor return and tank vent piping, under dispenser containment, vent transition containment, an enhanced vapor recovery system, and a vapor root monitoring system.  This required excavation, disposal of excavated soil, gravel back-fill materials meeting manufacturer specifications, crane, and back-filling operations. The new dispenser was calibrated and brought to compliance and Enhance Leak Detection was provided.

 

 

Carmax Escondido

Jauregui & Culver, Inc. installed a complete fuel system which included permits for San Diego County Environmental Health (DEH), San Diego County Air Pollution Control District (APCD) and City of Escondido fire department. a 4,000 gallon double wall fiber glass tank, fuel dispenser, and piping for the below-ground fuel, vapor return, and tank vent. Recovery (EVR) system and a Veeder Root monitoring system were also installed.  Calibration for the new dispenser, and regulatory compliance Enhance Leak Detection (ELD) testing were also provided.

 

 

 

Current Projects

 Current Projects

These are just a few of the many projects Jauregui & Culver, Inc. is part of.  In addition, we service over 300 different sites throughout California.  We offer our customers the very best in safety, quality, and customer service.

 

Sam’s Club Fullerton, CA ground up station

Gaslamp Hotel San Diego, CA emergency generator install

AST Upgrades  Multiple sites.  More details can be found here.

Sam’s Club El Monte #6614

Jauregui & Culver, Inc. installed a complete fuel system at Sam’s Club #6614 Bakersfield. We excavated and installed two 20,000 gallon 87 gasoline and one 20,000 gallon split 12,000/8,000 10′ diameter Xerxes Underground Storage Tanks (UST) and deadmen.

We installed Fiberglass, APT, and steel piping to compile the fueling system, including trenching and gravel back-fill. Two 3+1 gas/diesel dispensers and four 3+0 gas dispensers were installed, including the Under Dispenser Containment (UDC) basins, dispenser hanging hardware, and dispenser valance. Brine and vacuum tubing for the Veeder Root continuous monitoring and Pressure and Flow sensors in dispenser for the In Station Diagnostics (ISD). The Healy Clean Air Separator (CAS) was installed as part of the EVR II system.

We provided required Enhanced Leak Detection (ELD) testing of the fuel system at the conclusion of the installation of the fueling system and prior to opening. All fuel lines were purged and the dispensers and calibrated, completing this project.

Sam’s Club Sacramento #4760

The closure of Sam’s Club Sacramento #4760 necessitated the removal of two 20,000 gallon unleaded regular underground storage tank (UST) and one 20,000 gallon split 12,000/8,000 gallon Unleaded Super underground storage tank.  Jauregui & Culver, Inc. was contracted to do the following work. Concrete slabs, vapor return, and vent piping were removed and lawfully disposed.

Under the direction of the county CUPA and local Fire agency we removed the UST and piping from the trenches and lawfully disposed.  The tanks were washed and degassed with all wash materials manifested and disposed of lawfully.

The excavation and piping trenches were backfilled and compacted with clean fill materials and gravel to 90% compaction.