Design Build

now browsing by category

 

MCAS MCX Flight Line Miramar, CA

Jauregui & Culver provided a design build fueling system for MCAS Miramar including two 30,000 gallon Containment Solutions underground storage tanks, eight Gilbarco dispensers, clean air separator system, and canopy.

Sam’s Club Fullerton, CA

Jauregui & Culver, inc provided a ground up fuel station including four 20,000 gallon under-ground storage tanks, six dispensers, and an employee kiosk.

California Highway Patrol Chico, CA

Jauregui & Culver, Inc. installed a complete fueling system including an Above-Ground Storage Tank, two Wayne dispensers, two FuelMaster pedestals, veeder-root, and more. Also installed was a complete fueling system for a back-up Generator including Above-Ground Storage Tank, Simplex Packaged Pump Set unit, and piping.

COC Fuel Facility

Jauregui & Culver, Inc. did a full design build for the County of San Diego Operation’s fuel facility. We procured permits, installed tanks, canopy, and a fuel system. We custom built the shoring that went in on the sides of the tank hole. The concrete footings, tank slab, and drive slabs were poured. Jauregui & Culver, Inc. also installed the fuel management system and continues to provide service and testing for the station. The existing fuel site was demolished, and can be seen here.

In addition, Jauregui & Culver, Inc. provided piping for the emergency generator system and is continuing to design build for the emergency generator system and other projects at this facility.